HOME » Zoning Code » T6 Urban Core Zone » Specific to Zones
Contact:  
 Specific to T6 Zones
 


BUILDING DISPOSITION
Building disposition describes where the building sits in relation to the lot or parcel. The following are the specific regulations that apply to building disposition in a T6 zone. The diagrams below explain building setback requirements specific to each T6 zone. These regulations ensure that transitions occur between transects—creating a natural separation between buildings of incrementing capacity.

 

T6-8 ZONE BUILDING DISPOSITION

LOT OCCUPATION
a. Lot Area 5000 sq.ft  min.; 40,000 sq ft. max
b. Lot Width 50 ft. min
c. Lot Coverage

  
    1-8 stories
    Above 8 story

 



80% max. 
15,000 sq. ft. max. floor plate for Residential & Lodging
30,000 sq. ft. max. floor plate for Office & Commercial
d. Floor Lot Ratio (FLR) 5/ 25% additional Public Benefit
e. Frontage at front setback 70% min.
f. Open space Requirements 10% lot area min.
g. Density 150 du/acre max.

 

BUILDING SETBACK
a. Principal Front 10 ft. min.
b. Secondary Front 10 ft. min.
c. Side 0 ft.  or 30 ft. min. above 8th story
d. Rear 0 ft.  or 30 ft. min. above 8th story
e. Abutting T5 0 ft. min. 1rst through 5th story

10 ft. min. 6th through 8th story
30 ft. min above 8th story

    Abutting T4 6 ft. min. 1rst through 5th story
26 ft. min. above 5th story
    Abutting T3 6 ft. min. 1rst through 3rd story
26 ft. min. 4th through 5th story
46 ft. min. above 5th story
f. Across street from T3

    Principal front
    Secondary front

10 ft. 1rst through 3rd story
20 ft. min. above 3rd story

 

 

T6-12 ZONE BUILDING DISPOSITION

LOT OCCUPATION
a. Lot Area 5000 sq.ft  min.; 70,000 sq ft. max
b. Lot Width 50 ft. min
c. Lot Coverage
1-8 stories
Above 8th story

 

 


80% max. 
15,000 sq. ft. max. floor plate for Residential & Lodging
30,000 sq. ft. max. floor plate for Office & Commercial
d. Floor Lot Ratio (FLR) 8/ 30% additional Public Benefit
e. Frontage at front setback 70% min.
f. Green space Requirements 10% lot area min.
g. Density 150 du/acre max.

 

BUILDING SETBACK
a. Principal Front 10 ft. min.
b. Secondary Front 10 ft. min.
c. Side 0 ft.  or 30 ft. min. above 8th story
d. Rear 0 ft.  or 30 ft. min. above 8th story
e. Abutting T5 0 ft. min.

10 ft. min. 6th through 8th story
30 ft. min. above 8th story

    Abutting T4 6 ft. min. 1rst through 5th story

26 ft. min. 6th through 8th story
30 ft. min. above 8th story

    Abutting T3 6 ft. min 1rst through 3rd story
26 ft. min. 4th through 5th story
46 ft. min, above 5th story
f. Across street from T3 or T4

    Principal front
    Secondary front


10 ft. 1rst through 3rd story
20 ft. min. above 3rs story

 

T6-24 ZONE BUILDING DISPOSITION

LOT OCCUPATION
a. Lot Area 5,000 sq.ft  min.; 100,000 sq ft. max
b. Lot Width 50 ft. min
c. Lot Coverage

    1-8 stories
    Above 8th story

 

 


80% max.

15,000 sq. ft. max. floor plate for Residential & Lodging

30,000 sq. ft. max. floor plate for Office & Commercial

d. Floor Lot Ratio (FLR) 6 / 30% additional Public Benefit
e. Frontage at front setback 70% min.
f. Open space Requirements 10% lot area min.
g. Density 150 du/acre max.

 

BUILDING SETBACK
a. Principal Front 10 ft. min.
b. Secondary Front 10 ft. min.
c. Side 0 ft. min; 30 ft. min. above 8th story
d. Rear 0 ft. min; 30 ft. min. above 8th story
e. Abutting T5 0 ft. min. 1rst through 5th story

10 ft. min. 6th through 8th story
30 ft. min. above 8th story

    Abutting T4 6 ft. min. 1rst through 5th story

10 ft. min. 6th through 8th story
30 ft. min. above 8th story

 

T6-36 ZONE BUILDING DISPOSITION

LOT OCCUPATION
a. Lot Area 5,000 sq.ft  min.;
b. Lot Width 100 ft. min
c. Lot Coverage

    1-8 stories
    Above 8th story

 

 


80% max.

18,000 sq. ft. max. floor plate for Residential & Lodging

30,000 sq. ft. max. floor plate for Office & Commercial

d. Floor Lot Ratio (FLR) T6-36a: 12 /30% additional Public Beneift
e. Frontage at front setback 70% min.
f. Open space Requirements 10% lot area min.
g. Density 150 du/acre max.

 

BUILDING SETBACK
a. Principal Front 10 ft. min.
b. Secondary Front 10 ft. min.
c. Side 0 ft. min; 30 ft. min. above 8th story
d. Rear 0 ft. min; 30 ft. min. above 8th story
e. Abutting T5 0 ft. min.

10 ft. min. 6th through 8th story
30 ft. min. above 8th story

    Abutting T4 6 ft. min. 1rst through 5th story

26 ft. min. 6th through 8th story
30 ft. min. above 8th story

 

T6-48 ZONE BUILDING DISPOSITION

LOT OCCUPATION
a. Lot Area 5,000 sq.ft  min.;
b. Lot Width 100 ft. min
c. Lot Coverage

    1-8 stories
    Above 8th story

 

 


80% max.

18,000 sq. ft. max. floor plate for Residential & Lodging

30,000 sq. ft. max. floor plate for Office & Commercial

d. Floor Lot Ratio (FLR) T6-48a: 11 /50% additional Public Benefit
T6-48b: 18 /50% additional Public Benefit
e. Frontage at front setback 70% min.
f. Open space Requirements 10% lot area min.
g. Density 150 du/acre max.

 

BUILDING SETBACK
a. Principal Front 10 ft. min.; 20 ft. min. above 8th story
b. Secondary Front 10 ft. min.; 20 ft. min. above 8th story
c. Side 0 ft. min; 30 ft. min. above 8th story
d. Rear 0 ft. min; 30 ft. min. above 8th story
e. Abutting Side or Rear T5 0 ft. min. 1st through  5th story

10 ft. min. 6th through 8th story
30 ft. min. above 8th story

 

 

T6-60 ZONE BUILDING DISPOSITION

LOT OCCUPATION
a. Lot Area 5,000 sq. ft  min.;
b. Lot Width 100 ft. min
c. Lot Coverage

    1-8 stories
    Above 8th story

 

 


80% max.

18,000 sq. ft. max. floor plate for Residential & Lodging

30,000 sq. ft. max. floor plate for Office & Commercial

d. Floor Lot Ratio (FLR) T6-60a: 11/50% additional Public Benefit
T6-60b: 18/50% additional Public Benefit
e. Frontage at front setback 70% min.
f. Open space Requirements 10% lot area min.
g. Density 150 du/acre max.

 

BUILDING SETBACK
a. Principal Front 10 ft. min.
b. Secondary Front 10 ft. min.
c. Side 0 ft. min; 30 ft. min. above 8th story
d. Rear 0 ft. min; 30 ft. min. above 8th story
e. Abutting T5 0 ft. min. 1rst through 5th story

10 ft. min. 6th through 8th story
30 ft. min. above 8th story

 

 

T6-80 ZONE BUILDING DISPOSITION

LOT OCCUPATION
a. Lot Area 5,000 sq.ft  min.
b. Lot Width 100 ft. min
c. Lot Coverage

    1-8 stories
    Above 8th story

 

 


80% max.

18,000 sq. ft. max. floor plate for Residential & Lodging

30,000 sq. ft. max. floor plate for Office & Commercial

d. Floor Lot Ratio (FLR) T6-80a: 24/unlimited additional Public Benefit
e. Frontage at front setback 70% min.
f. Open space Requirements 10% lot area min.
g. Density 150 du/acre max.

 

BUILDING SETBACK
a. Principal Front 10 ft. min.
b. Secondary Front 10 ft. min.
c. Side 0 ft. min; 30 ft. min. above 8th story
d. Rear 0 ft. min; 30 ft. min. above 8th story
e. Abutting T5 0 ft. min. 1rst through 5th story

10 ft. min. 6th through 8th story
30 ft. min. above 8th story

 

Note: This Building Placement applies to all T6 Zones.
  BUILDING CONFIGURATION
Building Configuration describes how the building is modeled (its shape and form). Within building configuration, the following aspects are regulated: the building’s frontage, its façade, its height and any elements that protrude from the building such as porches and carports.
There are no architectural design standards relating to style in the Miami 21 Zoning Code.
   

Frontages
The frontage of a building is the area in front of the building. In T6 areas, typical frontages would be stoops or forecourts, shopfronts, and awnings. Galleries and Arcades are permitted by a Special Area Plan.

 

This chart regulates what type of frontages are allowed in T6

FRONTAGE
a. Common Lawn prohibited
B. Porch and Fence prohibited
C. Terrace or L.C. prohibited
D. Forecourt permitted
e. Stoop permitted
f. Shopfront & Awning permitted 
g. Gallery permitted by Special Area Plan
h. Arcade permitted by Special Area Plan
 

Illustration of a T6-24 Waterfront Drive

 
   

Building Height
Building height is also regulated within the building’s configuration. Under the Miami 21 Zoning Code, height is regulated in stories, specific to each T6 zone. Height regulations are achieved by regulating the building’s capacity (*see capacity regulation). These regulations are important for buildings in T6 zones in order to ensure a transition between transect zones.

 
   
T6-8 Zones  
a. Minimum Height 2 stories
b. Maximum Height 8 stories
c. Max. Benefit Height 4 stories, except when abutting a T3 zone
   
T6-12 Zones  
a. Minimum Height 2 stories
b. Maximum Height 12 stories
c. Max. Benefit Height 8 stories, except when abutting a T3 zone
   
T6-24 Zones  
a. Minimum Height 2 stories
b. Maximum Height 24 stories
c. Max. Benefit Height 24 stories abutting all zones except T3
   
T6-36 Zones  
a. Minimum Height 2 stories
b. Maximum Height 36 stories
c. Max. Benefit Height 24 stories abutting all zones except T3
   
T6-60 Zones  
a. Minimum Height 2 stories
b. Maximum Height 60 stories
c. Max. Benefit Height unlimited stories abutting all zones except T3
   
T6-80 Zones  
a. Minimum Height 2 stories
b. Maximum Height 80 stories
c. Max. Benefit Height unlimited stories abutting all zones except T3
   
 

Item c. (Maximum Benefit Height) is referring to the bonus heights developers can obtain when participating in the Miami 21 Public Benefits Program.

 

T6-8 Zone

T6-12 Zone

T6-24 Zone



T6-36 Zone

T6-60 Zone

T6-80 Zone
 
   
  About Us|FAQ|Project Timeline|Glossary of Terms|Contact Us |Press Room  
Print this Article Print this Page Send to a Friend Send to Friend bookmark this page Bookmark this page bookmark this page Home Disclaimer Privacy Your City, Your Plan 
Email: Planning@miamigov.com
© Copyright 2010 City of Miami Planning and Zoning Department All rights reserved.
444 SW 2nd Avenue, Miami, FL 33130 Tel. (305)416-1400 Fax: (305)416-2156